This study presents the energy and exergy analysis for unit three of the Al-Mosyab thermal power plant, which has a capacity of 225 MW. The energy losses, exergy destruction and second law efficiency, are computed. The objective is to obtain a comprehensive prediction of improvement that will happen in the performance. Results showed that the second law efficiency of the cycle is 34.91%, and the maximum exergy destruction was at the boiler by 86%. The plant's second law efficiency improves successfully to 37.65%, and 0.67 kg/s of the fuel mass flow rate can be saved. As well as, the total exergy destruction decreased by 10.8% at increasing the feedwater temperature to 230 °C. The second law efficiency has enhanced to 35.74% and 1.32% of the exergy destruction drops when reducing the mass flow rate of the desuperheater spray water of the main steam. The second law efficiency increased by 2.27%, and 1.25% of the total exergy destruction was reduced when the hot reheat pressure increased. Moreover, the analysis reveals that the plant's second law efficiency has grown by 6.45% and that the total exergy destruction has fallen by 3.31% when cold reheat steam temperature is reduced.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call