Abstract

Single phase earth-fault in MV grids usually causes overvoltagethat harm to human being and electric equipments. In 6kV mining grids ofVietnam, earth fault which is majority incident accounts 55% to 73% of thetotal faults. When earth fault occurs many grids’ eco-technical parameterswill be affected. Moreover, the overvoltage and earthing current can lead toserious electric shock accidents caused mainly by stepping-overvoltage ortouching-overvoltage. One of earthing relays requirements is to trip inminimum time duration in order to reduce the magnitude of earthing currentsand overvoltage. Base on the simulation in Matlab, the paper suggests a priorconnection diagram that allows an auto earthing-connection for improvingthe better performance of relays. The utilization of the diagram will help todecrease the tripping time of relays, reduce the amplitude of internalovervoltage as well as enhance the safety for human being in case ofearthing incidents.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.