Abstract

The aim of this paper was the efficiency improvement of methods for measurement of electric field strength in the vicinity of base stations, which was achieved in two areas: procedure for using shorter time intervals of averaging (comparing to 6min that standards stipulate) and model for the conversion from mono-axial measurements to isotropic case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call