Abstract

Large manufacturing assembly plants with sub assembly lines, sequenced material deliveries, and batch driven primary manufacturing operations often struggle with coordinating their sequenced part manufacturing and kitting operations with the dynamic constraints of the main final assembly line. This paper will outline the high level data model, workflow and use-case scenarios of how the Factboard system integrates into the factory's engineering and transactional data sources as well as how users have been able to use this more accurate, detailed and timely information to make better decisions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.