Abstract
Today’s marketplace imposes ever-tightening product pricing and quality requirements, shorter delivery times, and increasingly customized products. With increasing competition in today’s global market, companies are increasingly pressured to improve the performance of their production systems in order to be more competitive and improve market share. In order to try to satisfy these requirements several companies seek for the application of methodologies that may enable them to respond to these challenges, such as the ones based on the Lean Manufacturing philosophy. In this work standard times of four extruders are determined and updated in the context of setup time’s analysis and minimization in a company, in Portugal. First, a diagnosis is made to the tire floor extrusion process in order to evaluate all of its inefficiencies with the greatest impact on the production process, after the standard time of each extruder is analysed and updated through an extended approach which does also consider setup times reduction, along with the production times, for reaching a higher process optimization rate and productivity in the underlying production system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.