Abstract

The total pollutant load allocation (TPLA) can be transformed into an optimization problem with regards to water quality constraints. The optimization calculation may become very time consuming when the number of water quality constraint equations is great. A Trial and Error Method (TEM) to remove the redundant points was first introduced through iterative calculations under structure and non-structure model grids. The TEM was applied for the TPLA in the Bohai Sea in China. The calculation time was reduced to about 2min under the condition that 103,433 model grids met the water quality standards. In the best case, the optimization efficiency was improved by 98.9%. The allocation results showed that approximately 90% of total nitrogen (TN) load should be reduced in the 56 pollution sources around the Bohai Sea; of these values, roughly 85% of the reduction could come from 10 pollution sources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.