Abstract
Introduction:Patient transfer between teams and units is known to be a high-risk event for miscommunication and therefore error. We instituted a quality improvement initiative to formalize patient handoffs from the operating room (OR) to the Pediatric Intensive Care Unit (PICU). We hypothesized that measures of information transfer would improve.Methods:In this before and after study, a multidisciplinary team developed a standardized handoff protocol (including a checklist) instituted in the Dartmouth PICU over the summer of 2016. We directly observed pediatric admissions from OR to PICU and collected data on information transfer and patient outcome metrics both before and after the institution of the handoff protocol at the time of transfer (intervention).Results:We directly observed 52 handoffs (29 preintervention, 23 postintervention). The mean patient age was 9.3 years (SD, 6.5), with 55% male. Preintervention the average information transfer was 56% (upper control limit, 76%; lower control limit, 36%), whereas postintervention it was 81% (upper control limit, 97%, lower control limit, 65%). The improvement in information transfer postintervention was statistically significant (P < 0.001). There was no statistically significant change in maximum pain score in the first 6 hours after admission (preintervention, 4.5, SD 3.9; postintervention, 2.9, SD 1.3, P = 0.15). There was no difference in the time required for handoff pre- versus postintervention (8.7 minutes, SD 5.5 versus 10.1 minutes, SD 4.6, P = 0.34).Conclusion:Standardization of OR to PICU patient transfers using a predetermined checklist at the time of handoff can improve the completeness of information transfer without increasing the length of the handoff.
Highlights
Patient transfer between teams and units is known to be a high-risk event for miscommunication and error
We reported the overall completeness of information transfer for each of the multiple checklist elements during the handoff (Table 3)
In comparing the 3 section scores before and after the intervention, we found a significant increase in the completeness of information transfer in the proceduralist, anesthesia reports, and the overall checklist (P < 0.01) (Table 4)
Summary
Patient transfer between teams and units is known to be a high-risk event for miscommunication and error. We instituted a quality improvement initiative to formalize patient handoffs from the operating room (OR) to the Pediatric Intensive Care Unit (PICU). Methods: In this before and after study, a multidisciplinary team developed a standardized handoff protocol (including a checklist) instituted in the Dartmouth PICU over the summer of 2016. We directly observed pediatric admissions from OR to PICU and collected data on information transfer and patient outcome metrics both before and after the institution of the handoff protocol at the time of transfer (intervention). The improvement in information transfer postintervention was statistically significant (P < 0.001). Conclusion: Standardization of OR to PICU patient transfers using a predetermined checklist at the time of handoff can improve the completeness of information transfer without increasing the length of the handoff. Improving Handoffs between Operating Room and Pediatric Intensive Care Teams. Accepted for Abstract and Poster Presentation at the Pediatric Critical Care Colloquium, 2016, New York, N.Y
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.