Abstract
BackgroundLean is a process improvement strategy that can improve efficiency of the perioperative process. The purpose of this study was to identify etiologies of late surgery start times, implement Lean interventions, and analyze their effects. MethodsA retrospective review of all first-start surgery cases was performed. Lean was implemented in May 2015, and cases 7 months before and after implementation were analyzed. ResultsA total of 4,492 first-start cases were included; 2,181 were pre-Lean and 2,311 were post-Lean. The post-Lean group had significantly higher on-time starts than the pre-Lean group (69.0% vs 57.0%, P < .01). The most common delay etiology was surgeon-related for both groups. Delayed post-Lean cases were significantly less likely to be due to preoperative assessment (14.9% vs 9.9%, P < .01) and more likely due to patient-related (16.5% vs 22.3%, P < .01) or chaplain (1.8% vs 4.0%, P < .01) factors. Delayed starts occurred more often on snowy and cold days, and less often on didactic days (P < .01). ConclusionsModifying preoperative tasks using Lean methods can improve operating room efficiency and increase on-time starts.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.