Abstract

Engineering change management is a key part in the development of products that requires a lot of resources and time. A key problem is the lack of a shared ontology to describe engineering changes. This creates problems, additional effort and hinders the digitalisation of the engineering change management. This is especially true for the development of the automotive wiring harness where a low degree of automation together with the occurrence of many changes in a multi-variant system poses a big challenge. A description that is unambiguous, comprehensive and coherent is needed. The research presented in this paper tackles this problem. A standardised description for the engineering change management for the automotive wiring harness is introduced in this publication. The authors outline the approach that has been used to create a systematic description. The validation of the standardised description is based on two approaches: a case study of a development project and an ongoing development project. The validation shows that 94% of all engineering changes can be described in the proposed standardised way. Concepts where the standardised descriptions can be used to improve the engineering change process are outlined at the end of the paper. The paper thereby presents a way that directly improves the engineering change process and the product development process. It enables the further improvement of the engineering change management by providing a basis for an automatic processing, evaluation and implementation of engineering changes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call