Abstract

Distribution state estimation is a desired feature of modern power systems. The availability of measurements from smart meters has opened the door to extend the application of state estimation techniques down to end customers, preferably at the secondary distribution transformer level. However, the light coupling between phases makes the estimation of certain state variables, such as voltage phase angles, a great challenge. This paper proposes the use of synthetic measurements as a means of including cross-coupled information in the available set of measurements. This possibility can be easily implemented in line supervisors located at secondary transformer stations without the need for new hardware, just by embracing a different connection of measurement devices. This work demonstrates that this costless action results in a strong reduction of the sensibility of phase angle estimation errors with respect to measurement noise, thus leading to an important improvement in the quality of the results.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call