Abstract

Flexible job-shop scheduling problem (FJSP) is an extended job-shop scheduling problem. FJSP allows an operation to be processed by several different machines. FJSP with overlapping in operations means that each operation is divided into several sublots. Sublots are processed and transferred separately without waiting for the entire operation to be processed. In previous research, a mathematical model was developed and a genetic algorithm proposed to solve this problem. In this study, we try to improve the procedure of previous research to achieve better results. The proposed improvements were tested on some benchmark problems and compared with the results obtained by previous research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.