Abstract

The Oak Ridge Isochronous Cyclotron has been operating since January 1963. Initial experience with the rf system was enlivened by destructive sparking and general instability at the upper end of the rf tuning range. A network of protective devices developed during the past two years almost eliminates spark damage and improves the stability of the system. A multistage rf voltage regulator was also developed and installed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.