Abstract

This paper aims at improving the traditional U-shaped steel sets to efficiently support and stabilize the roadways in loose thick coal seam. The proposed supporting structure is an integrated shed system which is based on backfilling of chemical grouting material behind yieldable steel sets, i.e., metal mesh plus backfilled chemical grouting material plus double resistant geomembrane plus U-shaped steel sets. For implementation and verification, field experiments along with stress and deformation monitoring were conducted in the ventilation roadway of a top coal caving mining face. The results show that the proposed strategy can successfully solve the problems of roof fall, floor heave, large deformation and support damage of roadways in loose thick coal seam. In addition, comparing with the conventional supporting system of U-shaped steel sets, the improved system can also achieve a relatively faster excavation speed and reduce the overall support cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.