Abstract

The main objective of this work is to analyze and evaluate the risks in the activities and processes developed in a civil construction work focused on the sanitation area, through the improvement of the Preliminary Risk Analysis (PRA) integrated with the Ishikawa Diagram, seeking to reduce the subjectivity of the PRA technique, in addition to identifying and characterizing the existing risks in the activities performed by workers, the probability of their occurrence, the level and intensity of the risks, and also having the necessary recommendations for each observed risk. Daily monitoring was carried out at all stages of the executive process of the activities explored to identify the risks to be analyzed for the constitution of the PRAi (Ishikawa diagram integrated with the PRA). Based on the PRAi results, the incidence of physical, ergonomic and accident risks was observed. Based on this research, it became clear the importance of identifying the risks existing in the activities observed and the necessary protection measures to mitigate or even eliminate risks in the work environment, improving safety, quality of life, and, consequently, productivity.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.