Abstract
Purpose. Improvement of the current methodology for calculating the parameters of drilling and blasting (D&B) by determining the explosive force by the degree of realization of the detonation velocity for all types of industrial explosives (IE). The methodology of research. To solve the problem, a systematic approach was used, including an analysis of the current industry methodology for calculating the parameters of D&B in underground ore mining using IE, improvement of the power-law dependence of the calculation of the line of least resistance (LLR) of charges by determining the coefficient of explosive force of the IE, taking into account the degree of implementation of the burning rate, as well as approbation of the improved technique in the conditions of the operating iron ore mine. Findings. According to the methodology for determining the coefficient of explosive force of explosives (EX) according to the degree of implementation of the burning rate and according to the results of experimental studies of the change in the burning rate of the bulk emulsion explosive (EE) Ukrainit-PP-2, an improvement is proposed for the current industry methodology for calculating the parameters of D&B for the mines of the Kriviy Rig basin and the Private Joint Stock Society "Zaporozhye iron ore plant" (PJSS "ZIOP"). This made it possible, in the conditions of the experimental block of the mine "Yubileinaya" of the PJSS "Sukhaya Balka", using the bulk EE Ukrainit-PP-2, to increase the LLR and the distance between the borehole bottom up to 17%, and to obtain good results of ore reduction. The originality. The well-known power-law dependence of the determination of the LLR of borehole for rock breaking has been improved through the refinement of the coefficient of explosive force of the IE, which takes into account the degree of realization of the burning rate EX. Practical implications. The results of the research have improved the power-law dependence of the calculation of the LLR on the explosive force, taking into account the degree of implementation of the burning rate, the use of which will allow rationalizing the parameters of the D&B when breaking the ore mass using all types of IE.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Collection of Research Papers of the National Mining University
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.