Abstract

An artificial neural network, mid- to long-term runoff forecasting model of the Nenjiang basin was established by deciding predictors using the physical analysis method, combined with long-term hydrological and meteorological information. The forecasting model was gradually improved while considering physical factors, such as the main flood season and non-flood season by stage, runoff sources and hydrological processes. The average relative errors in the simulation tests of the prediction model were 0.33 in the main flood season and 0.26 in the non-flood season, indicating that the prediction accuracy during the non-flood season was greater than that in the main flood season. Based on these standards, forecasting accuracy evaluation was conducted by comparing forecasting results with actual conditions: for 2001 to 2003 data, the pass rate of forecasting in the main flood season was 50%, while it was 93% in the non-flood season; for 2001–2010, the respective values were 45% and 72%. The accuracy of prediction was found to decrease as the length of record increases.Editor D. Koutsoyiannis, Associate editor A. ViglioneCitation Li, H.-Y. Tian, L., Wu, Y., and Xie, M., 2013. Improvement of mid- to long-term runoff forecasting based on physical causes: application in Nenjiang basin, China. Hydrological Sciences Journal, 58 (7), 1414–1422.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.