Abstract
Currently, container ships move cargo with minimal participation from external trucks. However, there is slack time between the departure of container ships and the completion of cargo handling by container ships without the participation of external trucks; therefore, external trucks can be used to move cargo without delaying the departure time. In this paper, we propose a solution involving the control algorithms of transfer cranes (TCs) because the efficiency of yard operations depends largely on the productivity of TCs. TCs work according to heuristic rules using the forecasted arrival times of internal and external trucks. Simulation results show that the proposed method can reduce the waiting time of external trucks and meet the departure time of container ships.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Mechanical Systems for Transportation and Logistics
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.