Abstract

This article takes an interest in improving the performance of a subproblem of car sequencing: the resequencing problem. It extends a model of assembly line with the simulation of buffer stocks with drawers. Presequencing and resequencing are modeled with different types of stock management policy. Furthermore, postponement is introduced by two points of differentiation within the line. After choosing relevant variables and performance indicators a large-scale design of experiments finally enables to estimate average improvement brought by postponement to more than 39.7%, compared to the situation without postponement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.