Abstract
Plastic is fashionable raw material on manufacturing environment because of its low cost, ease of fabrication and relative durability. High production output rate with close tolerances is achieved by plastic injection machines and steel/alloy molds. However both the machinery and the molds are expensive equipments and pay back themselves in mass production. So, efficient usage is crucial where high demand fluctuations and increasing customization is a reality which forces engineers to lessen inefficiencies, one of which is changeover times in our focus. This paper proposes Taguchi experimental design to the trial runs phase of a changeover operation to get the parameters that gives the first correct product. Fewer trials lead less time needed to start mass production and also less waste of material.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.