Abstract

Electric switch machine locks the crossing rail in the working direction and checks the working status of the crossing. With the increase of train speed, the ZD(J)9 electric switch machine cant satisfy the equipment of high speed railway, This paper studied the optimization; in order to study the lock calculation of nose rail after conversion, a dynamic model is established to research the influence of working status of the crossing. It indicates that for the first traction point, the stress and deformation are mainly affected by scant displacement between nose rail and wing rail; for the second traction point, they are affected by the gap between nose rail and spacer; fastener lateral stiffness doesnt influence the stress status, but the lateral fastener stiffness should not be too small.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.