Abstract

Currently, the exploration and development scope of Changqing oilfield has gradually developed to edge blocks and deep systems, typically of Yanchi block. However, in the construction process, there are some problems such as poor well wall stability, frequent well leakage and prominent collapse contradiction, which seriously restricts the increase of drilling speed. In this paper, the measures such as well structure optimization, system formulation optimization, separate management of collapse and leakage, refined performance control, and pressure-bearing leakage plugging were taken by a combination with the construction situation in 2021 so as to improve drilling speed and reduce the complexity of downhole failures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.