Abstract

ABSTRACT Partial-depth repair is a concrete bridge deck rehabilitation method used when the deterioration is limited to the top half of the slab. The process includes removing the deteriorated concrete in small patch areas and replacing it with new repair material. While many advances have been made in repair material products to decrease the traffic closure times during curing, the patch preparation time still requires a significant amount of time which delays the repair time and adversely affects the transportation network. The most commonly used technique is the saw and patch due to its advantages which include cost-effectiveness, the capability to remove concrete from confined areas, and familiar to construction workers. In contrast, this method has two disadvantages; it is time consuming and labor intensive. Therefore, this study aims to decrease the patch preparation time by experimentally evaluating different sub-techniques in the saw and patch method to develop a specific methodology that reduces patch preparation time. The sub-techniques studied are patch discretization, sawing and jackhammering times, investigating four different discretized sawing and jackhammering methods in terms of removal time, equipment usage, damage to the surrounding concrete, and the labor efforts. The results of this study identify a time optimal sawing and jackhammering technique.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call