Abstract

The control of inverters with output LC filter has a special importance in applications where a high quality voltage is needed. However, the controller design becomes more difficult. A model predictive control (MPC) is used for voltage control of a three-phase inverter with output LC filter. The controller uses a model of the system to predict the behaviour of the variables for a given voltage vector sequence until a certain horizon of time, then a cost function is used as a criterion for selecting the switching state that will be applied during the next sampling interval. This paper presents the effect of considering different numbers of prediction steps in terms of THD and the number of cycles or the settling time to reach steady state operation. The simulation results for MPC with only one prediction step and the improved MPC with two prediction steps are presented and compared, under linear and nonlinear loads, using MATLAB/Simulink tools. The simulation results show that the improved MPC improves the THD for nonlinear loads and makes it constant for different resistive loads. Moreover, the settling time can be considered constant for various linear and nonlinear loads.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.