Abstract
For the design of tunnel linings not only the final soil loading, but also the loading during the construction phase is an important issue. Based on monitoring of several bored tunnels in the Netherlands it became clear that, in order to prevent damage in the construction phase, a better understanding of the construction loading is necessary. The research presented here focuses on the fluid grout pressure loads. A new model is derived describing the grout loads as a function of the tunnel length, i.e. as a function of the length axis behind a tunnel boring machine (TBM). The model is evaluated, comparing results with measurements at the Botlek railway tunnel, the Sophia railway tunnel and the Green Heart tunnel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.