Abstract

In this paper an improved genetic algorithm (GA) was present for magnetic material two-stage, multi-product, production scheduling problem (TMPS) with parallel machines. TMPS was changed into molding-stage's multi-product production scheduling problem (MMPS) and the scheduling model was set up for the first time. A set of random solutions were explored first, better feasible solutions were obtained by GA. To shorten the solving time and improve solution accuracy, an improved GA was proposed. We improved GA's crossover operator, adopted heuristic greedy 3PM crossover operator (HG3PMCO) to reduce GA's computational time. Through contrast of computational results of MILP, general GA and improved GA, the improved GA has demonstrated its effectiveness and reliability in solving the molding sintering production scheduling problems and the MILP model set up for the first time is reasonable. At last, the improved genetic algorithm was used in molding stage and sintering stage TMPS of magnetic material.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.