Abstract

The current paper relates the state of the art of construction of viaducts with a movable scaffolding system (MSS). Two different procedures are introduced: the traditional sequence and the new sequence applied to some viaducts in Spain. The traditional sequence consists of two phases: first, concreting the bottom slab and webs, and then concreting the top slab of the deck. Once the first and second casting phases are completed, the total prestressing force is introduced. The new sequence consists of concreting a self-supporting core (i.e., the bottom slab, webs, and only a portion of the top slab). Once the self-supporting core has hardened, a partial prestressing force is introduced so that the scaffolding can be advanced to the next span; the central zone of the top slab is cast in a second phase. Both sequences are described here with their constructive peculiarities and issues.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.