Abstract

Prior studies have proposed constructing confidence sets for the break date by inverting a sequence of tests for the date of a structural break. In this study, we improve these confidence sets by taking the direction of the break into account. Even when the break direction is unknown, we can consistently estimate it, enabling us to use the proposed method. Simulation results show that the proposed method effectively reduces the length of the confidence sets, while maintaining a good coverage rate. An empirical example illustrates the usefulness of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.