Abstract
A significant increase in copper prices on the World Metal Exchange, whose lower limit in the long term will not be under $ 6,000 per ton of cathode copper, and reduction the operating costs of ore mining by introduction the high capacity mining equipment in the production process, requires a new consideration of the open pit South Mining District Majdanpek and defining the new final (optimum) limit of mining for the given techno economic parameters. Using the modern software tools for strategic planning and optimization of deposit Whittle and software for design the open pit Gemcom, the optimum contour of open pit was designed on the principle of maximum profit realization. In the newly-defined contour of analyzed open pit, significantly higher geological reserves of deposit are affected in relation to the previous considerations of those amounts to the amount of 172,388,652 t of ore with average copper content in the ore of 0.383%. .
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.