Abstract

This study investigates the feasibility of siting a nuclear power plant (NPP) within a densely populated university campus. Site selection for NPPs is a complex process involving numerous interconnected factors. To address this complexity, we employ system dynamics (SD) modeling, a methodology renowned for its ability to quantify both technological and social aspects. Our simulation results indicate that public acceptance (PA) is a critical determinant in site selection. In the fourth month of the simulation, the model's values were identical in both PA and non-PA scenarios. However, subsequent simulations revealed a significant divergence, with PA-implicated values reaching 85.398 compared to 24.240 in the non-PA scenario. This disparity underscores the primacy of PA in the decision-making process. Given the extended timeline of NPP construction, the gap between PA and non-PA outcomes is likely to widen further, particularly in the context of positive public sentiment toward the NPP. The insights gleaned from this research can be applied to other industries, such as oil refineries, where the potential for atmospheric pollution due to toxic gas leaks necessitates careful site selection.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.