Abstract
This article provides a discussion of key components for the decisionmaker concerned with the logistical issues of implementing a Just‐in‐Time (JIT) manufacturing philosophy. A JIT philosophy promotes reduced cycle times that provide benefits not normally considered in traditional inventory models and presents new concerns for the purchasing and logistics functions. The ramifications are investigated of a JIT implementation using an inventory‐theoretic modelling procedure modified and expanded to incorporate these considerations. The resulting cost comparisons indicate that the lead time variability associated with uncertain transit times in JIT is critical in the determination of order cycle time, order point, safety stock and the holding cost of the safety stock.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Operations & Production Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.