Abstract

Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do not consider expected variations and uncertainty in metal content available in a mineral deposit (supply) and commodity prices (market demand). Unlike the conventional approach, a stochastic framework relies on multiple realizations of the input data so as to account for uncertainty in metal content and financial parameters, reflecting potential supply and demand. This paper presents a new method that jointly considers uncertainty in metal content and commodity prices, and incorporates time-dependent discounted values of mining blocks when designing optimal production phases and ultimate pit limit, while honouring production capacity constraints. The structure of a graph representing the stochastic framework is proposed, and it is solved with a parametric maximum flow algorithm. Lagragnian relaxation and the subgradient method are integrated in the proposed approach to facilitate producing practical designs. An application at a copper deposit in Canada demonstrates the practical aspects of the approach and quality of solutions over conventional methods, as well as the effectiveness of the proposed stochastic approach in solving mine planning and design problems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.