Abstract

This paper presents a novel simulation approach to evaluate new ancillary service controls in the context of large-scale wind power integration. We adopt and compare different types of turbine inertial control methods with the proposed modifications to cope with realistic wind conditions in the field. The simulation procedure is started with the software-based simulation, in which we employ the high-fidelity wind turbine simulator FAST that models a real three-bladed controls advanced research turbine (CART3). The advantages of using FAST are that it can provide convincing simulation results and address the interactions between turbine electrical and mechanical systems. The developed controller model is then rapidly prototyped for the real-time simulation with the hardware-in-the-loop scheme. CART3 will respond to a virtual frequency event triggered in the emulated electric grid modeled in a digital real-time simulator. The introduced simulation platform streamlines the procedure of designing turbine auxiliary controls, and these simulations results give insights on the turbine controls and their impacts on the interconnected power system, as well as the effects on turbine mechanical components. For example, the results indicate that the inertial controls tend to reduce the out-of-plane mechanical loadings in region 2, while such loadings are dominated by the pitch actions in region 3.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.