Abstract
Demand response adjusts demand through market signals such as price to promote grid reliability. By changing the demand for electricity, the demand response can realize the friendly interaction of sourcenetwork-load, promote the absorption of new energy, and thus applying to the rapid growth of the scale of new energy installation. Considering the characteristics of provincial power grid, this paper studies the power demand response trading organization and technology realization from the point of view of promoting clean energy consumption, and realizes it systematically. This method has universal application value for the same type of provincial power grid.
Highlights
The growth rate of new energy installed such as nuclear power, wind power and solar photovoltaic power generation is higher than that of traditional power supply, and the proportion of total installed capacity of power generation in China is increasing[1-2]
In order to solve this problem, the demand response can be used to guide the power demand to change through market signals such as price, so as to adapt to the characteristics of new energy generation and improve the level of new energy consumption
The electrical equipment participating in the real-time demand response should have the relevant technical capability of the load demand response management system of Xinjiang power grid
Summary
The growth rate of new energy installed such as nuclear power, wind power and solar photovoltaic power generation is higher than that of traditional power supply, and the proportion of total installed capacity of power generation in China is increasing[1-2]. Due to the factors of grid structure, load characteristics and power grid safety, the new energy grid absorption is limited, and the phenomenon of abandoning wind and light in local period exists. Considering the characteristics of provincial power grid, this paper constructs a provincial power demand response trading system suitable for new energy consumption from the point of view of source network load linkage, and realizes it[3-5]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.