Abstract

The equipment efficiency plays a great role in the profitability of a manufacturing company. It impacts the throughput, cycle times, costs, and return on investment in manufacturing capacity. This article presents the implementation case study of an Overall Equipment Efficiency (OEE) metric and improvement methods in the semiconductor backend facility (Final Test and Sort). The case study will show an effective combination of a fully automated OEE measurement system, company-wide personnel training, and Lean Six Sigma tools to achieve a substantial improvement in factory output. The methodology includes four main components: 1. Systems development and implementation 2. Bottleneck (BN) management procedures 3. OEE improvement teams 4. Adjustment of the operations management procedures Supported by the OEE metric to manage and improve the BN performance, the facility increased its output, in less than eight weeks, by ∼18%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.