Abstract

This study attempts to explain how Lean Sigma method implemented in a construction company Readymix in East Java. Data was obtained from a sample of five companies Readymixyang awarded for major industrial and financial resources derived from FDI (Foreign Direct Investment). There are two findings. First, the approach using Lean Sigma can be applied to the operation management based enterprise project Readyinix so it can be used as a reference to improve the performance of the organization and the second factor of the machine age and men to become the most dominant factor than other factors in the results of this study, where these factors are caused by not the machine age and the competence of human resources in the company.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.