Abstract
As a result of the restructuring of the Korean Power Generation Industry, Korean power companies are under increased pressure to increase capacity and lower operating costs. In order to achieve these goals, an on-line real-time performance monitoring system has been introduced to the Seoincheon and Sinincheon combined cycle power plants (CCPP). The on-line real-time performance monitoring and optimization system helps plant personnel operate the plants profitably by tracking plant performance changes based on real-time information. This paper outlines how the on-line performance monitoring system is being used to improve the operational efficiency and optimize equipment maintenance. Case studies showing the benefits provided by the system are presented. This system will be useful for the plants to respond to the competitive electricity market.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.