Abstract

Distribution automation technology plays a key role on power system reliability by providing faster detection, isolating the faulted area and restoring the fault. In this paper, the impacts of distribution automation are considered on radial distribution system in the event of substation transformer bank malfunction at maximum load level with the aim of deferring the big capital investments. The aim of the proposed method is not only to increase physical impact such as the reliability but also to monetize physical measures into significant economic benefits by deferring the overall investment costs. The proposed algorithm is tested with the real distribution system data, and it is shown that it can obtain remarkable economic benefits by deferring the larger capital equipment investments by making smaller investments in distribution automation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.