Abstract

Purpose: This study aims to analyze the implementation of the Building Construction Permit policy based on the Regional Regulation of South Timor Tengah Regency (TTS) Number 7 of 2015 in So’e City District, South Timor Tengah Regency and to analyze the inhibiting factors for implementing the Building Construction Permit policy based on the Regional Regulation of South Timor Tengah Regency Number 7 of 2015 in District of So’e City, South Timor Tengah Regency. Research Methodology: This research is a qualitative research using a descriptive approach. Data collection was carried out through interviews, observation and documentation. Results: The implementation of the Building Construction Permit policy in So'e City District, South Timor Tengah Regency can be viewed from four indicators, namely: (a) communication (b) resources (c) disposition (d) bureaucratic structure. Activities carried out by the Implementer are: building data collection, coordination with related agencies and issuing permits. The inhibiting factor for the implementation of the Building Construction Permit policy in So'e City District, South Timor Tengah Regency is the limited resources in the form of human resources, financial resources, operational resources, buildings that are not in accordance with spatial planning and many buildings that violate the boundary lines as well as public understanding of building permit regulations. Limitations: This study only analyzes the implementation of the Building Construction Permit policy based on the Regional Regulation of South Timor Tengah Regency Number 7 of 2015 in So’e City District, South Timor Tengah Regency. Contribution: This research becomes scientific information for public administration program. Keywords: Implementation, Policies, and Building Permits.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call