Abstract

Dynamic economic dispatch (DED) aims to schedule the committed generating units' output active power economically over a certain period of time, satisfying operating constraints and load demand in each interval. Valve-point effect, the ramp rate limits, prohibited operation zones (POZs), and transmission losses make the DED a complicated, non-linear constrained problem. Hence, in this paper, imperialist competitive algorithm (ICA) is proposed to solve such complicated problem. The feasibility of the proposed method is validated on five and ten units test system for a 24 h time interval. The results obtained by the ICA are compared with other techniques of the literature. These results substantiate the applicability of the proposed method for solving the constrained DED with non-smooth cost functions. Besides, to examine the applicability of the proposed ICA on large power systems, a test case with 54 units is studied. The results confirm the suitability of the ICA for large-scale DED problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.