Abstract

This paper considers a periodic preventive maintenance (pm) policy with ``minimal repair'' at failure; pm is imperfect. A special case of failure (hazard) rate improvement is postulated wherein pm reduces the failure rate, but does not return the time origin all the way to zero.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call