Abstract
Plug-in Electric Vehicles (PEVs) have gained popularity in recent years due to their environmentally friendly attributes. However, integrating PEVs into distribution systems poses novel challenges and opportunities. This research paper undertakes a comprehensive assessment of the repercussions of PEVs and distributed generation (DG) integration on the distribution system’s reliability, power loss, and voltage stability. In order to alleviate peak loads, select PEVs are deployed in Vehicle-to-Grid (V2G) mode. The integration of DG units, particularly solar Photovoltaic (PV) and wind turbine (WT) systems, is explored to mitigate the potential strain of PEV charging on the distribution system. The uncertainty of renewable DG and PEV charging-discharging, along with time-varying residential and commercial loads, are included in the analysis. Power interruption duration and frequency-based reliability index are considered in this work. The combined effects of PEVs’ Grid-to-Vehicle (G2V) and V2G mode and DG integration are comprehensively investigated, and the impact assessment is conducted on the modified IEEE 33 bus distribution system to ensure the practicality and applicability of the research findings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: e-Prime - Advances in Electrical Engineering, Electronics and Energy
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.