Abstract

This paper presents impacts of low voltage PEV single phase charging on electrical distribution network. Simulation model and analysis tools under DigSILENT Power Factory program were used in this research. There are 5 case studies under this analysis, where each case operates at different charging time durations between 16.00 and 24.00. Assessment of the impact of PEV charging is performed based on the PEA standards. The simulation results show that all charging case studies increase line loading in the distribution network over the limit by 80%. The voltage at the upstream point of the feeder slightly dropped while at the downstream point dropped 4 times lower. Average line losses for all case studies increase approximately 13.36% compared to the base case study.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.