Abstract

The cannibalization effect between new and remanufactured products impacts market demand and further influences supply chain design, which makes supply chain operations complex. This article studies the impact of cannibalization between new and remanufactured products on supply chain network design and operations by considering a joint pricing-location-inventory problem. A three-level supply chain network that consists of multi-distribution centers and retailers is considered. New and remanufactured products are supplied simultaneously. The problem is formulated as a nonlinear mixed-integer program and is then transformed into a conic quadratic mixed-integer program. An outer approximation-based solution approach is developed to solve the program. Extensive numerical experiments are conducted to explore the performance of the algorithm and the effects of market cannibalization on the supply chain network design and operations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.