Abstract

Regular sewer cleaning in North Rhine-Westphalia (Germany) generates annual costs of around 50 million Euros. This leads to the question of whether and to what extent sewer cleaning is necessary. To determine the effect of roughness, sewer surface condition and discharge, experiments with real wastewater were performed, using a sewer test track with acrylic glass tubes (DN 300) prepared with abrasive paper and nature stone tiles at the wastewater treatment plant (WWTP) Bochum-Ölbachtal (Ruhrverband, Germany). A logarithmic relationship between deposit height and time was found to lead to maximum deposit heights of 5 to 60 mm. Surface structure analysis by texture measuring indicated that deposits within the first 28 days after cleaning are highly influenced by the surface condition of the sewer and not necessarily by roughness. Furthermore, under dry weather conditions deposit heights are nearly stable after this time, indicating the limiting effect of sewer cleaning. Deposit formation amounted to 1.75-1.80 mm/d at a roughness of ks = 0.10 mm (fine but catchy microstructure) and 0-0.1 mm/d at ks 1.25 mm (wavy microstructure) at steady state and transient discharge within the first 28 days after sewer cleaning.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.