Abstract

ABSTRACTOver the past few decades, several technologies have been developed to recover phosphorus (P) as struvite from wastewater. Although these technologies have achieved reasonable P-removal efficiencies, these technologies are associated with several shortcomings such as high capital and operating costs, longer crystallization time and production of low-quality product. This study focussed on the development of an efficient technology by designing a new fluidized bed reactor (FBR) and determining its optimum operating conditions. The supersaturation ratio is the most important process parameter for struvite recovery. This study exerted effort to establish a range of supersaturation ratios in order to achieve optimum P-removal and recovery with a lesser amount of fine crystals produced. Bench-scale FBR used in this study was able to accomplish 90% P-removal with 18% P-recovery. P-removal efficiency was observed to be increasing with an increase in the initial supersaturation ratio up to a value of 6.5. On the other hand, an increase in the supersaturation ratio resulted in a lower P-recovery efficiency with an increase in fines production. The supersaturation ratio from 5.5 to 6.0 was found to be optimum for efficient operation of the reactor.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call