Abstract

The water resources of the Koshi Basin (87,311 km2) are largely untapped, and while proposals for their development exist, their impacts on current and future water demand are not quantified. The current study is the first to evaluate the impacts of 11 proposed development projects for hydropower generation and water storage. We find that 29,733 GWh of hydropower could be generated annually and 8382 million m3 of water could be stored. This could satisfy unmet demand in the current (660 million m3) basin situation and in future scenarios – i.e. population, agricultural and industrial growth – that are projected to have 920, 970 and 1003 million m3 of unmet demand, respectively, by 2050.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.