Abstract
The paper deals with the methodology and results of diagnostics in test sections near the tunnel portals of newly built tunnel Turecký vrch on modernized line Nove Mesto nad Vahom – Puchov. Based on the diagnostics results, transition areas are problematic sections of the construction. Transition areas were subjected to detailed analysis and based on trends of the development of geometric quantities are determined trends which predict time of needed maintenance. In order to optimize existing transition areas the design of transition in ANSYS software was modelled and problematic spots of construction were defined.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.