Abstract

AbstractThe earned value management system (EVMS) and the last planner system (LPS) have been widely used as effective performance measurement tools for construction managers and production units at construction projects. While the EVMS measures project-level costs and scheduling performances, the LPS measures the percent plan complete (PPC), which indicates the level of planning reliability. This paper investigates the relationship between planning reliability at the operational level and project performance at the management level (i.e., the success or failure of a project). Analyzing the empirical data of 23 residential projects of a large construction company, the authors find that, while the production plan in the weekly schedule is correlated rigidly with the daily plan in successful projects, such a rigid correlation is not observed in unsuccessful projects. To understand this finding, the authors further conducted interviews with project stakeholders. Taken together, this study suggests that an em...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.