Abstract

Tailing ponds are a major hazard source with the risk of dam breaks. To predict the impact of tailings pond dam breaks more accurately, one needs to quantitatively understand the dam-breaking process of the tailings reservoir and its downstream impact. This study is based on an old tailings pond that is about to be put out of service and the proposed new tailings pond next to it. Study the inundation range of the new and old tailing ponds with simultaneous overtopping dam breaks under actual terrain conditions. First, fine-grained tailings and expanded perlite were selected as the model sand materials, and the appropriate model sand ratio was determined through laboratory tests. Second, the two tailings ponds were tested (at a scale of 1:200), for flood overtopping and simultaneous dam breaks. The dam break, flow, section morphology evolution, submerged elevation, and range were analyzed. Finally, a numerical model was developed using MIKE 21 to simulate the simultaneous overtopping and collapse of the new and old tailings ponds, and the impact of rainfall intensity on the inundation range of the simultaneous overtopping of the dam was analyzed. The research results will guide disaster prevention and mitigation in tailings reservoirs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.