Power transmission expansion planning (TEP) is a process affected by uncertainty that requires a long-term vision to anticipate requirements of interconnections among generators and load centers. Flexibility is an alternative to cope with uncertainty that increases social welfare. This article seeks for estimating the value of this flexibility and interpreting its meaning in the Colombian power system. In order to keep this focus clear, we implement a well-known methodology of Real Options (RO) in a simplified version of the Colombian power system. Accordingly, we introduce flexibility using a simple strategy of adding new transmission lines and make a simple comparison with a robust approach, as the one currently used in Colombia. Our results show that introducing this flexibility in the Colombian TEP increases social welfare in around $35 million, which represents an upper bound for the additional investment costs incurred to provide this adapting ability to the power system. These results suggest the need for revising the current paradigm of robust approach to prepare future Colombian transmission plans.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.